5S Workshop

GOAL OF THE TRAINING:

Training of the 5S method in a practical workshop in a designated area of the company with the participation of a group of employees designated by the management on one day. To refresh participants' theoretical and practical knowledge on how to apply the method and sustain results.

 

In case of a larger number of employees, the training can also be ordered as outsourced to the company. If required, request our customized offer at the kepzes@kvalikon.hu email address.

1. NAP

KICK-OFF MEETING 

5S ASSESSMENT 

  • Practical techniques for productivity improvement and the 5S method
  • Steps of the 5S method. Implementation considerations and timing of implementation 
  • Aspects of the introduction of the 5S method
  • Support for implementation, 5S Office
  • Maintenance options, 5S Audit sheets  
  • Options for maintaining the implemented method
  • Experience with the 5S method in the country 
  • (Preparing the acquisition of the necessary tools for SEIRI, SEITON, if something is missing)

5S - DRAWING GAME 
SEIRI INTRODUCTION IN THE PILOT AREA

  • Common overview of the pilot (plant) area 
  • Capture of the current situation on digital photo and joint assessment of the current situation of 5S 

LOSS HUNT IN THE PLANT 

  • Discussion of aspects of SEIRI implementation 
  • Making a list of what is needed and what is not 
  • Red tagging and preparation of SEIRI standards
  • Preparing the tasks for the "SEIRI launch 
  • Definition of tasks and responsibilities 
  • Review of the work area, recording the current status on a digital camera
  • Disposal of surplus items 

PREPARING THE INTRODUCTION OF SEITON 

  • Placement, layout, marking rules 
  • Monitoring the process, time measurements
  • Aspects of using SEITON 
  • Conditions for using SEITON 
  • Definition of tasks and responsibilities 

DAY 2

INTRODUCTION OF SEITON IN THE PILOT AREA 

  • Organising what is needed
  • Setting up the workplace
  • Determining where to store each item 
  • Marking and labelling of things and storage places 
  • Arranging things

OVERVIEW OF THE RESULTS OF THE SEITON OPERATIONS 

  • Reviewing and evaluating the results of SEITON operations with management

PREPARATION FOR THE INTRODUCTION OF SEISO 

  • Discussion of the rules for SEISO implementation and use
  • Clear definition of tasks and responsibilities 
  • Discussion of SEISO review, preparation of standards development
  • Assignment of tasks 
  • Preparation of cleaning plan and checklists
  • SEISO - Cleaning up the sample area

DAY 3

ENSURING SUSTAINABILITY

  • 5S Developing an audit plan 
  • Clarify responsibilities 
  • Conduct 5S audit
  • 5S monitoring system and info board
  • Evaluation of results
  • 5S standards and regulations
Information and application

Please call for Quotation!kepzes@kvalikon.hu

Downloadable program